網站首頁技術中心 > CD-800 Dicing Machine               Instruction
產品目錄
CD-800 Dicing Machine               Instruction
更新時間:2013-07-29 點擊量:3931

This type of machine is specialized in vegetable and cormcutting. It is easily operating for woman. It is also the necessary facility for restaurants and second processing factories. Instantaneous ability is above 15 people. This machine will let you have satisfied feeling.

 

A.   Processing material

    Potatoes, carrots, melons, bamboos, onions, apples, vegetables and so on.

 

B. Processing dimension:

(standard)

               H                 10. 15. 20mm cubes or bars.

L              T            (special dimension)

                             3-20mm cubes or bars.

 

C. Capacity

15/mm cubes;    1000kg/hr

 

D.   Voltage

3 phase / 415V, 50Hz / 4P / 0.75KW

(each countries has different voltage connection)

E.   Machine dimension & weight

L 800×W 700×H 1260mm

 

F. Cutting work outline

    Connecting “ON” switch, add little water when machine is running and put suitable amount of material to the machine. (Material diameter under 8/cm). Leaf blade will turn over the material to the fixed thickness of the place of flate cutter. And crosscut cutter will cut the bars into cubes and flow down to the machine after round cutter cuts material into bars. Easily operate, and processing material is clean and delicacy.

 

 

 

 

 

 

 

 

 

 

 

G. Voltage connection

    Power: 3 phase / 415V / 4P / 0.75KW. Connect power cord (red, black, white) when use the machine. Then connect (green) line to insurance after that start to operating.

 B

 

 

 

 

 

               A

 

(1) The power line A connected to power supply. (Attention the    motor shift)

(Attention 4 power lines, green for the grounding line.)

(2) Water pipeline will be connected B, then the installation is completed.

 

 

 

H.   Installing location

    Consider whether the water drains unimpededly or not when install the machine.

 

I.   Watch out the machine running

    Make sure there are no foreign objects on the entrance of the machine and inside of the leaf blade after connecting voltage to avoid the cutter broken while the machine running. Make sure the direction of leaf blade is correct, rith circum gyratoin (clock-wise).

 

J. Method of adjusting thickness of flate cutting

The standard allocation method as follows: (if cut cube is formed by three Cutter)

(1) The first knife (cutting thickness): Plane broadswords Z.     (Adjustable by cutting thickness)

(2)   The second knife (cutting width): Circular knife Group Y.

  5mmP (space): 5mm

 10mmP (space): 10mm

 15mmP (space): 15mm

 20mmP (space): 20mm

 

(3)   The third knife (cut length): transverse plane knife Group.

5mm uses 15 knife group

10mm uses 8 knife group

15mm uses 6 knife group

20mm uses 4 knife group

 

K.   Method of adjusting aluminum fence

Aluminum fence feeds material to crosscut cutter when round cutter cuts the material. This is why the sharp place of aluminum fence has to get close to the cushion of gap of round cutter or the dimension of aluminum fence marks on the bottom right side.

 

L. Round cutter discharging

Round cutter dimension drawing

Round cutter dimension

 

 

Standard (mm)

P: 10

P: 15

P: 20

Special (mm)

P: 3-20

(1) Avert black screw of fixed eccentric axis.

(2) Pull down the fixed bolt of round cutter eccentric axis. Then round cutter can be discharged.

(3) Fix the u-shape spanner on the round cutter set, then loosen sexangular on the round cutter axis (two sides of 24m/m spanner), then it can be taken out.

 

 

 

M. Crosscut cutter discharge

Crosscut cubes round piece

5m/m uses 21 pieces

10m/m uses 8 pieces

15m/m uses 6 pieces

20m/m uses 4 pieces

(1) Fix u-shape spanner on the fixed crosscut cutter set when discharge crosscut cutter. Then loosen sexangular screw (24m/m spanner), then it can be taken out.

 

N. Daily cleansing

    Clean the machine after finish the jobs. Run the machine while operating, then wash it by flush water to clean the leavings.

O.   Standard by-products:

Spanner         10, 19, 24………….3

Screwdriver (-), (+)……….……………2

U-shape spanner                 1 PCS

Lubricant oil                    1

Tool box                       1 box

主站蜘蛛池模板: 亚洲乱码无人区卡1卡2卡3| 日本乱子伦一区二区三区| 亚洲多毛妓女毛茸茸的| 国产又粗又猛又大爽又黄| 欧美xxxxx精品| 国产成人无码一二三区视频| 亚洲国产一区二区三区波多野结衣| 人人做人人爽人人爱| 337p日本欧洲亚洲大胆色噜噜| 欧美v日韩v亚洲v最新在线| 蜜桃视频成人专区在线观看| 小sao货揉揉你的奶真大电影| 天天做日日做天天做| 日日av色欲香天天综合网| 国产精品国产三级国产剧情| 亚洲日本精品国产一区vr| 国产精品免费久久久久电影| 加勒比无码一区二区三区| 3d动漫精品啪啪一区二区| 国产成人av不卡免费观看| 卡1卡2卡三卡精品视频| 亚洲香蕉伊综合在人在线观看 | 国产又爽又黄无码无遮挡在线观看| 国产激情综合在线观看| 性欧美老肥妇喷水| 亚洲国产精品尤物yw在线| 久久久99无码一区| 亚洲色成人一区二区三区| 99久久精品费精品国产| 丰满的少妇xxxxx青青青| 伊人久久大香线蕉av一区二区| 国产欧美日韩一区二区图片| 制服国产欧美亚洲日韩| 亚洲中文字幕久在线| 亚洲国产精品日本无码网站| 高潮好爽视频在线观看| 国产日产高清欧美一区| 亚洲精品一区久久久久一品av| 荡女精品导航| 日本边添边摸边做边爱小视频| 久久无码中文字幕久久无码app|